The Finish That Brings the Room Together
Plastering is one of the stages where a room can suddenly begin to feel finished again.
Uneven walls, damaged surfaces, old finishes and the marks left behind by electrical, plumbing or building work can all prevent a renovation from looking complete.
Calico can coordinate plastering as part of a wider renovation or as a more focused improvement, helping create smooth walls and ceilings ready for the next stage of decorating.

Plastering for Repairs, Renovations & New Spaces
From repairing a damaged section to plastering an entire renovated room, we can coordinate the right level of work around the condition of the surfaces and the wider project.

Wall Plastering
Create smooth wall surfaces following renovation, repair or preparation work, ready for decoration once appropriately dried and prepared.

Ceiling Plastering
Repair, renew or skim ceiling surfaces where previous finishes, alterations or damage have left them uneven or unsuitable for decorating.

Skimming
Apply a new finishing layer to suitable existing surfaces to improve their appearance and provide a smoother base for decoration.

Plaster Repairs
Repair damaged, cracked or disturbed areas where localised work is more appropriate than replastering the entire room.

Plasterboard & New Surfaces
Create new wall and ceiling surfaces as part of extensions, conversions, partitioning and other renovation work before the final plaster finish.

Renovation Plastering
Coordinate plastering after structural alterations, electrical work, plumbing or other trades have changed walls and ceilings during a renovation.

The Finish Is Only as Good as the Surface Beneath It
Plastering should not be used simply to hide an underlying problem. The wall or ceiling needs to be suitable for the finish being applied.
Loose surfaces, damaged plasterboard, moisture problems, movement and previous repairs can all affect what preparation is required before plastering begins.
Because Calico works across the wider renovation, we can look at those issues alongside the building, carpentry, plumbing and electrical work rather than treating the visible surface in isolation.
Plastering Should Happen at the Right Stage
On a renovation project, the order of the trades matters. Plastering too early can mean newly finished walls have to be cut into again later.
Cables, socket boxes and other first-fix electrical work should be completed before final plastering where appropriate.
Pipe routes and other concealed plumbing should be considered before walls and ceilings are closed and finished.
Studwork, framing and other first-fix carpentry need to be ready before plasterboard and plaster finishes are completed.
The cause of damp or water damage needs to be addressed rather than simply covered with a new finish.
New plaster needs suitable time and conditions to dry before the decorating stage begins.
Good preparation after plastering helps the decorating stage achieve a cleaner and more consistent finish.

From Damaged Surface to a Clean Finish
The right approach depends on the condition of the existing wall or ceiling and what has happened elsewhere in the room.
Assess
We look at the existing surface, damage and wider renovation work to understand what preparation may be required.
Prepare
Loose materials, damaged boards or other unsuitable areas are dealt with before the plaster finish is applied.
Plaster
The appropriate plastering or skimming work is carried out to create the required wall or ceiling finish.
Dry & Decorate
Once properly dried and prepared, the surface can move through to the final decorating stage.
Sometimes the Walls Are What Make a Room Feel New Again
Old cracks, patch repairs and uneven surfaces can make a room feel tired even after everything else has been improved. Fresh plaster can give the whole space a cleaner starting point.
Before
After Good Plastering Supports the Finish That Follows
Plastering sits between the building work and the final decoration, so it needs to create the right surface for everything that comes afterwards.

We Know What Happened Before the Plasterer Arrived
On larger projects, plastering is affected by almost everything that has happened earlier in the renovation.
Walls may have been moved, doors altered, cables installed, pipes rerouted or new timber structures built. All of those stages influence the surface that eventually needs to be finished.
Because Calico coordinates the wider project, we can plan those stages together and reduce the risk of finished walls being unnecessarily disturbed again later.
Complete the Room From First Fix to Final Finish
Plastering Across Hampshire
Calico is based on Hayling Island and undertakes plastering, renovation and finishing work throughout Hampshire and surrounding areas.
Hayling Island • Havant • Portsmouth • Southsea • Emsworth • Waterlooville • Chichester • Fareham • Petersfield • Southampton
If your location is not listed, please still get in touch. The distance we travel can vary depending on the scale and nature of the project.
Plastering Services FAQs
Do you plaster complete rooms?
Yes. Full-room plastering can be carried out where walls and ceilings require a new finish as part of renovation or refurbishment work.
Do you skim existing walls?
Yes, where the existing surface is suitable. The condition of the wall should be assessed first to determine whether skimming is the appropriate solution.
Can you plaster ceilings?
Yes. Ceiling plastering and skimming can be carried out where surfaces need repairing, renewing or improving before decoration.
Can you repair damaged plaster?
Yes. Localised repairs can be carried out following damage, alterations or previous work where replastering the complete wall is unnecessary.
Can you repair walls after electrical work?
Yes. Electrical alterations can leave channels, socket openings or other areas that require making good before the room is redecorated.
Can you repair walls after plumbing work?
Yes. Where plumbing alterations disturb walls or ceilings, the affected areas can be made good as part of the wider project.
Do you install plasterboard?
Yes. New plasterboard walls and ceilings can form part of extensions, conversions, partitions and renovation projects before plastering is completed.
Can you plaster over cracks?
Cracks should be assessed before simply being covered. The cause and amount of movement can influence whether repair, preparation or further investigation is required before plastering.
How long does new plaster take to dry?
Drying time varies with thickness, ventilation, temperature and conditions within the property. New plaster should be allowed to dry properly before the appropriate decorating system is applied.
Can Calico decorate after the plastering is finished?
Yes. Plastering can be coordinated with our wider painting and decorating work so the room can continue through to its final finished appearance.
Do Your Walls or Ceilings Need Attention?
Whether you need a damaged area repaired, an old room skimmed or complete plastering as part of a renovation, talk to Calico about the condition of the existing surfaces and what you want the finished room to become.
We'll help you understand the practical options and coordinate the plastering with the other work where required.
Discuss Your Plastering Project



